Energy storage

For storage manufacturers: commission on the existing BMS, not a new FEMS

Energy management is already a product at known manufacturers, often in house or on OpenEMS. The useful project is a commissioning and alarm app for a system builder who has hardware and Modbus and does not yet show a technician tool.

Book a technical assessment (opens Calendly in a new tab)
Andrej Albrecht
30 minutes, technical assessment
First release, one family
Commercial storage with BMS Technician
Technician app on existing Modbus Android · iOS
Energy management stays

Battery safety and warranty logic stay on the BMS. No new energy manager.

Typical technology ModbusBMSAndroidiOS What each interface yields

Every site is a different mix. Support is a phone call.

PV, loads, and tariffs differ per site. The technician needs commissioning and alarms on the existing BMS, not a second energy manager.

Modbus is there, the app is not

The hardware speaks. The technician works from a laptop or a phone call.

OpenEMS is a real alternative

If you can adopt it, do that. A full custom stack is the weaker path.

Home storage

Price questions about home batteries are a different topic. This page is for commercial storage.

What the phone call does not replace

Without a tool on the BMS, every site takes as long as the first.

The technician's day · Technician · Energy storage

Without the app

  1. 1 A dealer without a computer postpones the visit
  2. 2 Commissioning only with the laptop
  3. 3 The operator notices the state when someone calls
  4. Every site like the first

With the app

  1. 1 Phone over the existing Modbus or BMS connection
  2. 2 Commissioning steps at the container
  3. 3 Read the alarm the BMS already owns
  4. Battery logic stays there
  • Commissioning only with the laptop. A dealer who does not bring a computer postpones the visit.
  • The alarm arrives late. The operator notices the state when someone calls.
  • Warranty stays untouched. Battery safety sits on the BMS. A display must not overwrite it.

Why this is not a new energy manager

First question: is the app needed at all? If a product already does the workflow, the assessment ends there.

Buy packaged or build

Can a packaged product already do the workflow?

A packaged product is enough

Products named: FEMS, myTESWORLD, OpenEMS, monitoring of imported units
  • OpenEMS covers the operation
  • The imported unit already monitors itself
  • Home storage: a different topic

A custom app is worth it

One family, one workflow, first release
  • System builder with Modbus and no technician app
  • Two workflows missing: commissioning and alarms
  • The dealer does not bring a laptop

If yes, the assessment ends there. No second platform beside a product that already does the workflow.

FEMS and myTESWORLD

We do not replace them.

OpenEMS

If it covers the operation, that is the shorter path.

A state-of-charge dashboard

That can be a display. It does not commission the storage system.

What the technician app does in the first release

One system, one existing Modbus or BMS connection. Commissioning and alarms.

Device, app, system · Energy storage
Today
Commercial storage with BMS Technician
manual
Laptop or phone call
Every site takes as long as the first
Operator
First release
Commercial storage with BMS Technician
Technician app on existing Modbus Android · iOS
Energy management stays
Commissioning: the steps from the laptopAlarms: read the state the BMS knowsNothing beyond that

Boundary: Battery safety and warranty logic stay on the BMS. No new energy manager.

Commissioning

The steps the technician does on the laptop today.

Alarms

Read the state the BMS already knows.

Boundary

Battery safety and warranty logic stay on the BMS.

Interfaces of the device family

One system, one existing Modbus or BMS connection. Commissioning and alarms.

Interfaces of the device family · Commercial storage with BMS
Device speaks
ModbusThe existing connection
BMSState and alarm
Path today
Laptop / phone callToday: commissioning and support
Packaged product
FEMS / myTESWORLD / OpenEMSEnergy management. We do not replace it

Imported systems often already include monitoring. Then there is no project.

How the work runs

Discovery. The assessment checks whether FEMS, myTESWORLD, or OpenEMS already do the workflow. What can remain is a system builder with no technician app on existing Modbus. We do not build a new energy manager in this step.

  1. 2

    Show the connection you have

    Modbus or BMS. If it already has an app, stop.

  2. 3

    Two workflows

    Commissioning and alarms. Nothing beyond that in the first release.

  3. 4

    Test at the container

    Connection, a dropout, one alarm the BMS already owns.

  4. 5

    Safety stays

    The app does not rewrite battery logic.

Why Albrecht Apps

No storage reference. We do not pitch a FEMS alternative.

Named work from another industry

iTENDO · INNIRION · 2019 to 2024

From 2019 to 2024 Andrej Albrecht built the Android app for iTENDO: Bluetooth LE to sensors on an industrial tool holder for INNIRION. That is not a project in the industry on this page. Hardware and firmware stay with the manufacturer. Albrecht Apps takes the app, the backend, and the cloud.

Bluetooth LEAndroidTool holder, other industry
Example, not a client project

Alarm and commissioning at the container

The technician commissions a commercial storage system over the existing Modbus and reads the alarm the BMS already knows. Battery logic stays there.

The published IIoT article describes how a tablet companion app could be built today. It is a method article, not a delivered client project, and not evidence for this industry.

App development. BLE app development.

Questions before a project

OpenEMS covers us.
Then use it. A second management layer is the wrong project.
We are hiring cloud staff.
That can be right for energy management. A technician app on existing Modbus is a smaller cut.
Is this about home batteries?
No. This page is for the commercial system builder.
The imported unit already monitors itself.
Then the assessment ends there.

First question: is the technician app already there?

Bring the Modbus or BMS connection. If FEMS or OpenEMS already does the workflow, we will say so.

Book a technical assessment (opens Calendly in a new tab) 30 minutes with Andrej Albrecht about a system that does not yet show a technician app. Opens Calendly in a new tab.

Three points the assessment settles:

01Commissioning: the steps from the laptop
02Alarms: read the state the BMS knows
03Nothing beyond that
Andrej Albrecht, Albrecht Apps GmbH
30 min technical assessment Book a technical assessment (opens Calendly in a new tab)